Limit | Alert level | Side of the limit management | Small impact works (GWh 25°C) |
Interruption of sales and interruptible/UIOLI | Locational spread | Mutualized restriction |
---|---|---|---|---|---|---|
NS1 |
|
|||||
NS2 |
|
|||||
NS3 |
|
|||||
NS4 |
|
|||||
EO2 |
|
|||||
S1 |
|
|||||
SN1 |
|
|||||
SN3 |
|
Limit | Alert level | Side of the limit management | Small impact works (GWh 25°C) |
---|---|---|---|
NS1 | |||
NS2 | |||
NS3 | |||
NS4 | |||
EO2 | |||
S1 | |||
SN1 | |||
SN3 |
27/02/2021 | 28/02/2021 | 01/03/2021 | 02/03/2021 | |
---|---|---|---|---|
Limit | Alert level | Alert level | Alert level | Alert level |
NS1 | ||||
NS2 | ||||
NS3 | ||||
NS4 | ||||
EO2 | ||||
S1 | ||||
SN1 | ||||
SN3 |
* D+5 data publication starts on D-5 3.30pm.
Limit
|
Upstream points
|
Downstream points
|
---|---|---|
NS1 |
NS1 upstream superpoint (SPNS1U)
|
|
NS2 |
NS2 upstream superpoint (SPNS2U)
Restrictions on point level :
|
NS2 downstream sub-superpoint (SSPNS2D)
TEREGA sub-superpoint
|
NS3 |
NS3 upstream superpoint (SPNS3U)
Restrictions on point level :
|
NS3 downstream sub-superpoint (SSPNS3D)
TEREGA sub-superpoint
|
NS4 |
NS4 upstream superpoint (SPNS4U)
Restrictions on point level :
|
TEREGA superpoint
Bonus point
|
S1 |
TEREGA superpoint
|
|
EO2 |
EO2 upstream superpoint (SPEO2U)
Restrictions on point level :
|
EO2 downstream sub-superpoint (SSPEO2D)
TEREGA sub-superpoint
|
SN1 |
Restrictions on point level :
TEREGA superpoint
|
|
SN3 |
Restrictions on point level :
TEREGA superpoint
|
SN3 downstream superpoint (SPSN3D)
|
Interruption of sales and interruptible/UIOLI :
Curtailment of interruptible transport capacities (including backhaul and UIOLI) and stop of capacity trading on the points/direction which stress the limit. Only on the side of the limit's management.
Locational spread :
Call to the market on the gas stock exchange, with a twofold locational product: the TSOs buy gas downstream of the limit and sell it simultaneously upstream of the limit.
Mutualized restriction :
Partial restriction of firm capacities, pro-rata to the subscribed capacities, mutualized on a superpoint. Only on the side of the limit's management.